Residential

Location: Claremorris, Co. Mayo

Size: 2700 ft / 250 m2

BER: A2

Finished Date: July 2018

Designed by DMC Designs Ballinrobe this new build house commenced in June 2017 and took 13 months to complete. Full fill cavity (150mm) insulation used and finished in nap plaster and local stone on the front of the house. Large amount of glass at the rear of the house supplied by WRL in Galway. We took the build from foundation to builders finish.

Location: Milltown, Co. Mayo

Size: 2700 ft / 250 m2

BER: A3

Finished Date: July 2018

This A3 rated house was designed by hubert Deane & Associates in Williamstown. Construction with a cavity wall and 110mm kingpin insulation, it achieved a 1.9 airtightness score. Taken to a builders finish, the house was finished with underfloor heating and a air to water heat pump. Took just 13 months to complete.

Location: Claremorris, Co. Mayo

Extension Size: 1000 ft / 92 m2

BER: Pending

Finished Date: April 2017

Established in 2010. Walsh Construction is your one stop shop for all your building requirements from New Builds to Renovations. We are Fully insured. Call us now for a quote.Established in 2010. Walsh Construction is your one stop shop for all your building requirements from New Builds to Renovations. We are Fully insured. Call us now for a quote.

Location: Barnacarroll, Co. Mayo

Extension Size: 450 ft / 40 m2

BER: Pending

Finished Date: March 2018

This 40 sq metre extension designed by O Conaire Consulting Engineers, Ballindine was constructed in 2017/18. Existing mass concrete extension was demolished to make way for a new cavity wall. House was replumped and rewired, finished with underfloor heating and double heigh ceilings. Extensions windows were supplied by Jordan’s Windows.

Location: Claremorris, Co. Mayo

Extension Size: 450 ft / 40 m2

BER: Pending

Finished Date: November 2014

This 1960’s bungalow situated on the outskirts of Claremorris town was fully gutted and renovated to a turnkey finish. A 40 sq metre extension and 25 sq metre garage was constructed, fully rewired and plumped. The extension was build with a cavity wall and pumped with insulation. Windows and doors supplied by Grady’s Joinery.

Location: Ballindine, Co. Mayo

Extension Size: 320 ft / 30 m2

BER: Pending

Finished Date: March 2016

This turnkey 30 sq metre extension was constructed in 2016. Extension designed by O Conaire Consulting Engineers was located in the middle of a row of terrace houses with limited access. Extension was constructed with a black cavity wall with 100mm insulation, all internal works were completed to the clients requirements. Windows and doors were supplied by Jordan windows

Location: Dunmore, Co. Galway

Extension Size: 3000 ft / 280 m2

BER: Pending

Finished Date: October 2016

This period style 3000sq ft house located in Dunmore, Co. Galway was finished very uniquely. Work completed in the house consisted of 2nd fix carpentry, wall panelling and wainscotting. liaised with client at all stages to achieve their vision of the house. Work was all completed in a 6 week timeframe in 2016.